1566范文网 > 公司范文 > 岗位职责 > 工程岗位职责
栏目

工程前期岗位职责(2篇范文)

发布时间:2023-08-26 热度:16

工程前期岗位职责

第1篇 工程前期岗位职责

岗位职责:

• study of customer data

• generate of cost calculation

• support in cost reduction study/proposal

• any other assigned tasks assigned by the company

interface with front end europe to provide cost calculation support (europe)

qualification

work experience

2-3 years in pcb business (area: front end engineering); or 3 to 5 years of relevant experience for diploma graduates

methods & programs

• compliance with ms-office

• sap

skills

• knowledge of genesis, incam, data input and analysis

• understand pcb processes

• good communication skills

• detail oriented, methodically working, stringent

• ability for own responsible activities and flexibility in daily work

• required language skills: good english and mandarin in speaking, reading and writing. german will be an added advantage.

第2篇 工程前期部岗位职责

岗位职责:

1.熟悉各属地电力公司土建、电气验收流程;

2.熟悉配电室,开闭站,外电源工程的施工流程;

3.熟悉各属地电力公司、大客服、监理等相关环节的报竣资料的制作,负责组织工程项目送电的相关手续的办理工作;

4.负责具体做好工程合同的业务洽谈及签订工作;

5.负责具体协调、维护与甲方的关系;

6.负责工程预付款的回收工作;

7.积极配合其他岗位或部门的管理工作

职位要求:

1.办公软件:熟练运用word,excel,cad,pdf,potoshop等办公软件及监理软件

2.工作经历:三年以上北京地区电力工程报装接电手续办理经验

3.培训经历:受过电力施工技术管理方面的培训

4.技能要求:具有较好的组织协调能力、人际沟通能力、社会关系能力、计划与执行能力、团队合作能力等,熟悉供电局报装流程及行业规定,具备较好的语言及书面表达能力,能看懂电气施工图,了解广联达软件,工作态度严谨认真,能够严格保守企业的秘密。

《工程前期岗位职责(2篇范文).doc》
将本文的Word文档下载,方便收藏和打印
推荐度:
点击下载文档

相关专题

相关信息

最新加入范文

分类查询入口

一键复制